On Saturday, April 9th the
Seven Mile Bridge Run will shut down traffic both north and south for two and a
half hours at the Seven Mile Bridge. Travelers should plan to be across the
bridge by 6:30 a.m. to avoid being stuck on one side or the other. Traffic flow
will resume at 9 a.m., but usually takes at least an hour after that to get
back to normal flow.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.